It would be great is PSA set up additional operations capacity at SGC HQ in FL to cut down 4 days of round trip travel time for those submitting to PSA from the East Coast. This would improve UX and also take some burden off the CA operation.
I also wonder what the electricity cost is to run grading slab machines in FL vs CA. If significantly less expensive in FL, with PSAs crushing volume, they could save a lot of money by operating in FL with SGCs existing infrastructure.
|