View Single Post
  #41  
Old 08-18-2014, 11:07 PM
steve B steve B is offline
Steve Birmingham
Member
 
Join Date: Sep 2009
Location: eastern Mass.
Posts: 8,162
Default

Quote:
Originally Posted by tedzan View Post
Well, on this account, I differ from you.

The MAGIE error card and the JOE DOYLE (Nat'l error) card absolutely tell us that PIEDMONT backs were FIRST printed on the sheets of pre-printed fronts.

There is no other logical explanation for the PIEDMONT-only backs on these cards and the scarcity of them.


TED Z
.
You missed an important bit when quoting.

"Because of time constraints I don't see any brand being produced first. Certainly portions of a series for some brands were done before others, but Getting it done would probably have required almost constant output for the bigger brands.

Magie was probably very early, and yes, would have gotten Piedmont first. But there's no way of knowing whether Magie was on the very first sheet or a later sheet. If we knew which cards were with Magie then we might be able to tell. If it was with the other 150 only cards and the whole sheet was pulled and reworked. Maybe it was early. If not then there were sheets done before that one and they would have had a range of backs.

The Doyle tells us nothing about the sequence of backs. The error would have been easily corrected on the press, Unlike Magie which was reworked. So the Doyle could have happened anytime during the 350 run.

Scot Rs estimates of production are as high as 100 million just for Piedmont in 1910. I don't think it's realistic to think they printed all the Piedmonts them moved on to whatever was next. Even if the production number was 1/3 of that it makes no sense.
What does make sense - if it was a normal sheet fed press or more likely presses. would be printing a group on multiple presses until either the order was complete or the plates wore out. Then moving on to the next sheet layout. The raw numbers make the use of one sheetfed single color press nearly impossible. 9375 hours at 1000 sheets /hour. for 100 million. 3093 hours for 33 million. A full year of 50 hour weeks is only 2600 hours.

Those numbers assume a 96 card sheet. Smaller would take longer larger would be faster.

Multi color presses would reduce the time a lot. As would faster presses which were usually webfed. (Printing from a large roll of paper rather than from sheets.)

Steve B
Reply With Quote